Wichita Home Works LLC

Glenhurst Court Kitchen Remodel Near Andover, Kansas

Location

Andover area, Kansas

Project Investment

Approximately $60,000

Actual Duration

Approximately 7 months

Services Included

Design planning, demolition, framing, electrical, plumbing, drywall, trim carpentry, cabinet installation, custom peninsula panels, quartz countertops, backsplash tile, cabinet staining, finish carpentry, under-cabinet lighting, sink and faucet installation, dishwasher coordination, range hood installation, inspections, punch-list work, and final cleaning

Key Features

Maple Almond stained Shaker cabinets, Calacatta Laza quartz countertops, black workstation undermount sink, matte black Delta Trinsic faucet, herringbone range backsplash, horizontal subway tile sink backsplash, peninsula with custom maple panels, appliance garage, pantry cabinet, under-cabinet lighting, pendant lights, black cabinet hardware, relocated refrigerator, relocated dishwasher, and updated kitchen work zones

Best Fit For

Homeowners near Wichita, Andover, Eastborough, Derby, Rose Hill, Bel Aire, and surrounding areas who want a highly functional kitchen remodel with warm wood cabinetry, quartz countertops, custom storage, updated lighting, and a more intentional layout

Project Overview

Wichita Home Works completed this kitchen remodel near Andover, Kansas for homeowners who wanted to modernize their kitchen while keeping a warm, wood-forward feel.

The original kitchen included honey-toned cabinetry, tile flooring, laminate-style countertops, a raised bar wall, older backsplash areas, black appliances, and a layout that needed better storage and updated work zones. The remodel replaced the dated finishes with new Maple Almond stained Shaker cabinetry, Calacatta Laza quartz countertops, a black workstation sink, matte black fixtures, updated backsplash tile, custom peninsula detailing, new lighting, and improved appliance placement.

The finished kitchen feels polished, warm, and practical. It keeps the comfort of stained wood cabinetry while adding a cleaner layout, better storage, updated lighting, high-contrast black accents, and a more current design.

The Homeowner’s Vision

The goal was to create a kitchen that felt updated and more functional without losing the warmth of natural wood tones. The homeowners wanted new cabinetry, improved storage, a refreshed peninsula, updated lighting, a better sink and dishwasher layout, and a more finished connection between the kitchen and adjacent living spaces.

Wichita Home Works’ in-house design team helped develop the cabinet layout, refrigerator relocation, peninsula configuration, appliance placement, backsplash design, lighting plan, countertop selection, hardware selections, and overall finish direction.

The plan documents show a kitchen of approximately 391 square feet, with the design focused on relocating the refrigerator, installing new countertops, adding a new backsplash, replacing cabinetry, coordinating flooring, adding a microwave cabinet, and creating improved trash, spice, and cooking storage areas.

The finished design used a warm traditional-to-transitional palette with Maple Almond stained cabinetry, Calacatta Laza quartz, black fixtures, matte black cabinet hardware, a black workstation sink, and a combination of horizontal tile and herringbone tile backsplash patterns.

Scope of Work

Wichita Home Works coordinated the project from demolition and rough-in work through cabinetry, countertops, backsplash, lighting, finish carpentry, inspections, and punch-list completion.

The project included:

Demolition and Preparation

The project began with removal of the existing kitchen and dining room tile flooring and underlayment, kitchen backsplash, drywall behind the backsplash, existing kitchen faucet, sink, countertop, sink light, sink valance, upper and lower kitchen cabinets, and framing and trim carpentry from the existing bar wall.

The existing kitchen hanging light was removed and saved for reinstallation, and the appliances were moved into the garage during the remodel.

This early phase cleared the way for a new cabinet layout, updated peninsula, new backsplash areas, revised lighting, and a more cohesive kitchen design.

Framing and Layout Updates

Framing work included extending an existing kitchen and dining room wall, building a new pony wall for the bar and cabinet layout, and framing the peninsula back wall.

These framing changes helped support the new cabinet layout and gave the peninsula a more finished, furniture-like appearance. The custom peninsula panels were later built from maple with Shaker-style rails and stained to coordinate with the new cabinetry.

Electrical and Lighting

The electrical scope included removing existing bar backsplash outlets, adding an outlet inside the peninsula blind corner cabinet, replacing backsplash outlets, wiring for the new dishwasher location, refrigerator location, range location, over-the-range hood location, DC microwave in the pantry cabinet, outlet in the pantry cabinet, outlet in the appliance garage, LED under-cabinet strip lights, two new pendant lights, and a new wall sconce above the sink.

The design included matte black lighting details, including a gooseneck-style sink sconce and pendant lighting over the kitchen island or peninsula area.

Plumbing and Appliance Coordination

Plumbing work included running new water and drain lines for the relocated dishwasher, setting new shutoff valves and water supply lines for the kitchen sink, installing an InSinkErator half-horsepower garbage disposal, setting under-sink drains for the single-bowl sink, installing a matte black Delta Trinsic pull-down kitchen faucet, setting the customer-supplied dishwasher, and running a new cold water line for the refrigerator.

This helped reorganize the kitchen’s work zones and supported the updated appliance layout.

Drywall, Cabinets, and Custom Trim

Drywall work included preparing existing and new framing, installing drywall at the backsplash areas, wall extension, and new bar wall, installing outside corners, and finishing the drywall smooth.

The kitchen received Koch Classic Savannah Shaker cabinetry in Maple Almond stain. The cabinetry included base cabinets, upper cabinets, a trash pullout, appliance garage, blind corner storage, pantry-style cabinetry, three-drawer storage near the stove, and matching crown molding on the upper cabinets.

A custom maple panel system was built on the dining-room side and end of the peninsula. This included Shaker-style rails and cabinet baseboard, stained and finished to coordinate with the new cabinetry.

Countertops, Sink, and Backsplash

The countertops were MSI Calacatta Laza 3CM quartz with a quarter-inch roundover edge. The countertop scope also included the sink window planter shelf area.

The sink was a Karran black quartz composite undermount single-bowl workstation sink with accessories, paired with a black decorative disposal flange and matte black Delta Trinsic faucet.

The backsplash used Emser Craft II Fawn 3×12 glossy tile. On the sink wall, the tile was installed horizontally in a 1/3 offset pattern. On the stove wall, the same tile was installed in a herringbone pattern to create a stronger focal point behind the range hood. The backsplash was finished with Mapei Ultracolor Plus Alabaster grout and Schluter Jolly Trendline Greige edging.

Finish Carpentry and Hardware

Finish carpentry included installing the customer-provided range hood, installing cabinet hardware, completing custom trim details, finishing the peninsula panels, and handling punch-list work.

The cabinet hardware included matte black Jeffrey Alexander Sullivan pulls on the doors and drawers, with final hardware sizing coordinated for the smaller drawer locations so the finished layout would look consistent and function properly.

Design and Finish Details

This kitchen has a warm transitional style with traditional wood character and updated modern accents.

The Maple Almond stained Shaker cabinets bring warmth and texture to the space, while the Calacatta Laza quartz countertops brighten the room and give the kitchen a more refined surface. The matte black hardware, black sink, black faucet, and black sink drain create contrast against the lighter cabinetry and counters.

The backsplash adds visual interest without overpowering the room. The horizontal tile on the sink wall keeps the space calm and classic, while the herringbone tile behind the range creates a subtle focal point.

The new peninsula gives the kitchen more usable counter space and a more finished connection to the dining area. Custom maple panels on the back of the peninsula help the new cabinetry feel integrated instead of simply installed.

Construction Story

The construction process began with demolition, appliance relocation, tile flooring removal, cabinet removal, backsplash removal, and preparation for the new framing and rough-in work.

Daily logs show the project moving through demolition, plumbing rough-in, electrical rough-in, drywall installation, cabinet delivery, cabinet installation, countertop coordination, backsplash tile, cabinet hardware, peninsula staining, crown molding, punch-list work, inspections, and final replacement components.

The team coordinated closely with the homeowners during rough-in to confirm outlet and switch locations before work moved forward. This helped make sure the electrical plan supported how the homeowners intended to use the remodeled kitchen.

As the project progressed, Wichita Home Works actively managed cabinet delivery timing, countertop coordination, and finish sequencing so the major phases could continue moving in the right order. The logs show continued communication with suppliers and the homeowners as cabinetry, countertops, backsplash, and finishing details came together.

The final stages focused on the details that make a kitchen feel truly complete: tile installation, caulking, hardware placement, peninsula staining, toe-kick and trim coordination, added crown molding, inspection follow-up, and punch-list refinements.

The homeowners were excited throughout the process and, by the final stages, loved the new kitchen. The remaining closeout work centered on fine-tuning hardware sizing, finish matching, crown molding components, and punch-list items so the completed project reflected the intended design.

Challenges Solved

Layout and Appliance Reorganization

The project involved relocating key kitchen elements, including refrigerator and dishwasher connections, while also adding dedicated storage areas for microwave, pantry use, trash, spices, and cooking function.

Peninsula Redesign

The existing bar wall was removed and reframed into a new peninsula layout. Custom maple panels were added to the dining-room side and end of the peninsula so the finished piece would look intentional from multiple rooms.

Cabinet and Countertop Coordination

The cabinet, countertop, and backsplash phases required careful scheduling and communication. Wichita Home Works coordinated supplier timing, cabinet installation, countertop templating, and backsplash sequencing so each phase could support the next.

Hardware and Finish Refinement

Final hardware placement was coordinated around drawer size and cabinet function. The team adjusted hardware selections where needed so the finished cabinetry would operate well and maintain a consistent visual style.

Inspection and Closeout Detail Work

The project included inspection follow-up, electrical coordination, touch-up punch-list work, crown molding adjustments, and replacement finish components to support a polished final result.

The Finished Result

The finished Glenhurst Court kitchen feels warmer, more functional, and more refined than the original space. The new stained Shaker cabinetry gives the kitchen a timeless foundation, while the quartz countertops, matte black fixtures, herringbone backsplash, and custom peninsula panels add a more elevated look.

The kitchen now has better storage, more intentional appliance placement, updated lighting, under-cabinet lighting, a high-function workstation sink, and improved work zones for cooking, cleanup, and daily use.

The final result shows how a kitchen can be fully modernized while still keeping the warmth and character of stained wood cabinetry.

Why This Project Matters for Future Kitchen Remodel Clients

This project is a strong example for homeowners who want a kitchen remodel that does not simply replace old cabinets with new cabinets. It shows the value of layout planning, appliance coordination, lighting updates, custom trim details, backsplash design, countertop selection, and finish-stage project management.

For homeowners near Wichita, Andover, Derby, Eastborough, Rose Hill, and Bel Aire, this project shows how Wichita Home Works can help update a dated kitchen into a warm, practical, and highly finished space.

A successful kitchen remodel requires more than attractive selections. It takes trade coordination, cabinet planning, plumbing and electrical updates, field adjustments, inspection readiness, and careful closeout work.

Thinking About a Similar Kitchen Remodel?

If you are planning a kitchen remodel near Wichita or Andover, Wichita Home Works can help you think through the full project.

That includes layout, storage, appliance locations, cabinetry style, countertop options, backsplash patterns, lighting, plumbing, electrical, peninsula design, hardware, timeline expectations, and final finish details.

A kitchen remodel has many moving parts. The right design-build team helps organize those decisions into a clear, manageable process from planning through completion.

FAQs

Does Wichita Home Works remodel kitchens in Andover, Kansas?

Yes. This project was completed near Andover, Kansas, showing Wichita Home Works’ ability to complete detailed kitchen remodels in communities surrounding Wichita.

What cabinet style was used in this kitchen?

The kitchen used Koch Classic Savannah Shaker-style cabinetry in Maple Almond stain.

What countertops were installed?

The countertops were MSI Calacatta Laza 3CM quartz with a quarter-inch roundover edge.

What type of sink was used?

The kitchen included a black Karran quartz composite undermount single-bowl workstation sink with accessories and a black decorative disposal flange.

Did this kitchen include a custom peninsula?

Yes. Wichita Home Works reframed the peninsula area and added custom maple Shaker-style panels on the dining-room side and end of the peninsula.

What backsplash pattern was used?

The project used Emser Craft II Fawn 3×12 glossy tile. The sink wall was installed in a horizontal 1/3 offset pattern, and the stove wall was installed in a herringbone pattern.

Did Wichita Home Works provide design services for this kitchen?

Yes. Wichita Home Works’ in-house design team helped plan the cabinet layout, appliance locations, peninsula design, backsplash layout, countertop selection, lighting, hardware, and overall finish direction.

What style is this kitchen remodel?

This project has a warm transitional style, combining stained Shaker cabinetry, quartz countertops, matte black accents, classic tile, custom peninsula detailing, and updated lighting.

Who is a good fit for this type of kitchen remodel?

This type of remodel is a good fit for homeowners who want better kitchen storage, updated work zones, new cabinetry, quartz countertops, improved lighting, a more functional peninsula, and a warm but updated kitchen design.